About · Facilities

Two sites in use, and a third on the way.

The head office and laboratory have been in Yongin, Gyeonggi-do, since the company was founded. Since June 2024 our UNIST Research Institute in Ulsan (the UNIST site of our Corporate Affiliated Research Institute) has worked on probiotic strains. At Magok in Seoul we have contracted to put up a new building, and construction starts shortly.

The sites in use

What each site is for.

Head office

Yongin head office and laboratory

1F Cheongsol Building, 16-6 Eondong-ro 125beon-gil, Giheung-gu, Yongin-si, Gyeonggi-do, Republic of Korea, since September 2021. Study design, biostatistics, EDC build and operation, CRF design and regulatory writing all happen here.

Corporate Affiliated Research Institute

UNIST Research Institute

Ulsan, since June 2024. Developing probiotic strains by natural adaptation and selection, whole-genome sequencing and deposit, and in-house lab-scale research.

Construction to start

New building at Magok, Seoul

The building contract is signed and construction starts shortly; occupancy is planned for the end of 2027. The use and floor area will be published once the design is settled.

What happens at each site

The head office and laboratory have been in Yongin-si, Gyeonggi-do, since the company was founded. A new facility is being prepared in the Magok industrial complex in Seoul, with move-in planned for the end of 2027.

Our UNIST Research Institute has been running since June 2024; probiotic strain research and in-house lab-scale research are carried out there.

Protocol design, site selection and monitoring, data management, biostatistics, EDC build and operation, and CRF design are carried out by staff at the Yongin head office. Where any part of a project is subcontracted, that scope is written into the contract.

  • Yongin — clinical and nonclinical study design
  • Yongin — biostatistics
  • Yongin — EDC build and operation, CRF design
  • Yongin — AI model development and research
  • Ulsan — probiotic strain research
  • Ulsan — in-house lab-scale research
  • Monitoring and data management
  • Study report writing

Sites at a glance

Yongin (head office and laboratory)Since September 2021. Study design, biostatistics, data management. AI model development and research since 2026.
UNIST Research InstituteSince June 2024. Probiotics and in-house lab-scale research.
Magok facilityMove-in planned for the end of 2027.

What the Yongin head office covers

What the Yongin head office covers
ItemDetail
In operation sinceHead office opened September 2021; institute recognised December 2021
Main researchClinical and nonclinical study design, biostatistics
DataEDC build and operation, CRF design, data management
DeliverablesProtocol, monitoring records, study report
Linked functionsRegulatory affairs work sits at the same site

The scope of each project is settled in its contract.

The ground-floor entrance of the Cheongsol Building, where the Yongin head office is. The glass door carries “Welcome to AriBnC” and the company mark
Ground floor, Cheongsol Building, Giheung-gu, Yongin-si — the visitor entrance.

Frequently asked questions

Where is the head office, and where are the research sites?

The head office has been in Yongin-si, Gyeonggi-do since the company was founded in 2021. The lab and the clinical and data staff are at the Yongin head office; probiotic strain work and in-house lab-scale research are done at the UNIST Research Institute, opened in June 2024.

Which facility does the study work and the paperwork?

Study design, biostatistics, EDC build and operation, CRF design and the writing of regulatory documents all happen at the Yongin head office and institute. Developing probiotic strains by natural adaptation and selection, whole-genome sequencing, deposit and in-house lab-scale research are done at the UNIST Research Institute.

When does the Magok building come into use?

The construction contract is signed and ground-breaking is close. We expect to move in at the end of 2027; we will announce its use and floor area once the design is final.

Can we visit?

Visits are by appointment. Tell us by the phone number or email address on the Visit us page and we will set the time aside. A visit to check on a study in progress, or an audit, is arranged through the person running that project.

Send us the enquiry form and the person who would run the work replies within two to five business days.